Free tool · Construction
Seam finishes: what each one costs you, and what you get
Pick a finish for each part of the garment. See how it looks and wears, what machine the factory needs, and roughly how it moves the sewing price against the simplest build. Bring your factory’s quote and it turns into dollars.
2 · Fabric weight (woven)
voile, lawn, silk, rayon challis
3 · Start from
4 · Your numbers (optional)
No quote yet? Leave it blank and compare the percentages, or try the cost calculator.
Sewing labor vs simplest
+3 to +8%
Estimated CMT
$14.42–$15.12
per unit, from your $14 quote
Extra over 300 units
$126–$336
Look Wear
Ask each factory if they have: Hemming folder helps · Binder attachment
For your tech pack
Top or blouse, light-weight woven. Finishes: - Main seams: Serged (overlock or safety stitch) - Hem: Double-turned hem - Neckline: Bias binding
Main seams
Side seams, shoulders, sleevesBest forMost ready-to-wear. A 5-thread safety stitch sews and finishes in one pass.
Watch outVisible inside. Fine on most clothes, reads basic on a premium shirt.
Factory needsOverlocker, on every line
Hem
Bottom hem and sleeve hemsBest forShirts and straight hems. Clean inside with no raw edge.
Watch outGets bulky in heavy fabric; ripples on deep curves.
Factory needsHemming folder helps
Neckline
Neck edge, V-necks, collarsBest forV-necks and curved necklines in production. Fast with a binder.
Watch outMiter the point of a V, or it bunches.
Factory needsBinder attachment
Details
Anything that adds operationsBest forKeeping it simple.
Factory needsA standard sewing line
Want someone to check the construction?
A technical designer or pattern maker can spec the finishes, seam allowances and stitch types so every factory quotes the same garment.
The labor figures are rough rules of thumb for a small-batch woven garment, shown as a share of a simple-build sewing quote. They move a lot with the factory, its machines, the fabric and the run size, so treat them as a way to compare options, not a quote. Ask factories to price the finishes you pick, ideally per operation, so you can see what each one really costs you.